Past Major Projects

MSSC

Malaysia-Singapore Second Crossing




The bridge is comprised of 24 piers and 2 abutments in which 4 piers and 1 abutment belongs to Singapore and the others in Malaysia. Prior to the bridge construction, reclamation was conducted with sand compaction piles and PVD with preloading to strengthen and speed up the consolidation settlement of marine clay for the bridge abutment and custom offices in Singapore. Kiso-Jiban conducted geotechnical analysis, soil investigation and geotechnical instrumentation for the reclamation. Piers and abutment were supported by large diameter piles installed into limestone with cavity. Kiso-Jiban carried out the foundation design and made specification of pile foundation how to take care cavity in the limestone in the construction.


Project Name Malaysia-Singapore Second Crossing
Owner Name former Public Works Department of Singapore
Client Name former Public Work Department of Singapore
  with T Y Lin International Pte Ltd (Singapore side bridge)
Penta- Ocean Construction Co Ltd (Singapore side reclamation)
Sumitomo Construction (Singapore side bridge)
Toyo Construction (Malaysian side bridge)
Year 1994 - 1998
Location Singapore
Capabilities Geotechnical
Job Scopes Geotechnical design of bridge foundation, soil investigation and geotechnical instrumentation